CONNECTING THE DEFENCE COMMUNITY WITH INSIGHT, INTELLIGENCE & OPPORTUNITIES

Officially Supported By: Defence Contracts International Supply2Defence

Official Media Partners for:

General Atomics Aeronautical Systems Inc. (GA-ASI) has successfully completed key system-level tests for the new Protector RG Mk1 Remotely Piloted Aircraft (RPA).

The Protector is the UK Royal Air Force’s version of the MQ-9B SkyGuardian®, which is GA-ASI’s latest model of RPA and is on track to become the world’s first certified Medium-altitude, Long-endurance (MALE) RPA. The first Protector is expected to complete its test and evaluation program late 2022 and arrive in the UK in 2023.

The recently completed tests include Full-Scale Static Strength, High-Intensity Radiated Frequency (HIRF) and Environmental Testing. Most of the tests were performed by GA-ASI using internal research and development funding with the Royal Air Force (RAF) and US Air Force supporting key elements of the HIRF testing.

“It’s exciting to see the progress of the Protector Programme,” said RAF Group Captain Shaun Gee, Director Air ISTAR Programmes (RPAS and TacISR), and SRO Shadow Programme. “GA-ASI has provided support, not only in the testing of the aircraft, but in developing this game-changing RPA platform. GA-ASI provided a company MQ-9B over this past summer and operated it from RAF bases in the UK to help us get acquainted with its operational capabilities ahead of the first delivery of Protector.”

The Full-Scale Static (FSS) test included multiple stress tests where the full fuselage, wings, tails and landing gear were tested to 150% of the highest operational loads. FSS tests the strength of all the major structures in the aircraft, verifying its safety and reliability when operated at maximum airspeeds and G-loads. This is key to demonstrating the aircraft’s airworthiness, which will enable Protector to fly in all classes of UK and international airspace.

Environmental Testing took place at the McKinley Climatic Laboratory at Eglin Air Force Base and featured a variety of tests, such as extreme cold temperature (to -33 degrees Celsius), in-flight ice, supercooled fog, in-flight rain, high humidity, and high temperature with solar load.

High-Intensity Radiated Frequency testing occurred at the Electromagnetic Environmental Effects (E3) Test Facility at the Naval Air Station Patuxent River where the system was subjected to high-intensity electromagnetic radiation across the full operational electromagnetic spectrum. The test program also included the Hazards of Electromagnetic Radiation on Ordnance (HERO) testing for the Protector weapons load-out.

Chris Dusseault, Senior Director for the Protector RPAS at GA-ASI, said: “These critical system-level tests prove the safety and reliability of our aircraft to operate in extreme climates and electromagnetic environments.

“We’re proud to see the design concepts of MQ-9B be proven in operational environments bringing the Protector system one step closer to fielding with our RAF partner.”

image courtesy of GA-ASI

If you would like to join our community and read more articles like this then please click here.

GA-ASI Protector RG Mk1 RAF RPA

Post written by: Matt Brown

LATEST STAKEHOLDER

Become a Stakeholder today and benefit from an exclusive marketing package which will allow you to:

  • Engage with active defence buyers and key supply chain partners
  • Create your own branded micro-site which within Defence Online which is managed by you
  • Have a dedicated Digital Account Manager to help enhance your Stakeholder page
  • Promote your news, products, press releases, eBooks and Videos as a Defence Online partner which feeds through to our homepage and social media channels
  • Have your company promoted on our partner website Defence Contracts Online (DCO)
  • All news promoted in mynewsdesk, a major hub for all of our news articles which enables news to be picked up from trade magazines, national newspapers and many other publications which offers extra exposure at no additional cost!

Contact us today or call us on 0845 557 1315 to take advantage of this exclusive marketing package


RELATED ARTICLES

The new air defence laser system. MOD Crown Copyright.

November 6, 2024

Air - New air defence laser engages multiple missiles at once  

RAF pilots are one step closer to being equipped with a cutting-edge air-protection laser self-protection system, following 100% successful live-fire

McLaughlin & Harvey complete a key facility that will be used to maintain the E-7 Wedgetail fleet in Scotland.

October 9, 2024

Air - Key E-7 Wedgetail facility officially opened by Royal Air Force

McLaughlin & Harvey complete a key facility that will be used to maintain the E-7 Wedgetail fleet in Scotland. The new